American Water Company – Indiana Progressive Design-Build Mooresville

Mooresville, Indiana

Project Description

The design and construction of the Mooresville WTF included the scopes of work below: 

  • Raw Water Piping 
  • Aeration/Detention Tanks 
  • Horizontal Pressure Filters 
  • Chemical Storage and Feed Systems 
  • Sodium Hypochlorite 
  • Sodium Permanganate (if required) 
  • Fluoride 
  • Phosphate for Corrosion Control 
  • Truck Unloading Containment 
  • Treatment Building to House the Chemicals, Electrical Gear, and Maintenance/Parts Storage Room 
  • Space for Future Treatment Processes for Perfluorinated Compounds 
  • Finished Water Storage 
  • High Service Pumping Station 
  • (3) VTP High Service pumps rated at 1.5mgd per pump, capable of producing 4.5mgd total.  The plant is rated at 3mgd. 
  • Backwash Residuals/Recycle Facilities 
  • Residuals Management 
  • Office and Administrative Space 
  • Garage and Storage Building 
  • Parking Space for Employees and Visitors 
  • Electrical Power Distribution Equipment 
  • Emergency Power Generator 
  • Instrumentation and Control (I&C) Systems 
  • Associated Site Work 

At A Glance

Contract Amount:
$18,774,595

Notice to Proceed:
November 25, 2020

Est. Completion Date:
October 31, 2022

MGD: 3.0

Owner Contact Info:
American Water Company – Indiana

Engineer Contact Info:
Gannett Fleming, Inc.

Get in Touch