American Water – Indiana Sheridan Water Treatment Facility
Sheridan, Indiana
Sheridan, Indiana
This design-build project is a new groundwater treatment facility that will reduce iron and manganese from potable well water. The design includes new water wells, aeration, filtration, chloramination, distribution pumping, waste residuals treatment, and chemical storage and feed systems. To supply current and future water demands, the Sheridan WTF project includes the addition of a new wall, improvements to existing wells, aeration and detention tanks, horizontal pressure filters, chemical storage and feed systems, treatment building to store chemicals and gear, finished water storage, high service pumping station, backwash equalization basin, office and administration space, laboratory, and facility tour features.
Contract Amount:
$24,985,785
Notice to Proceed:
September 1, 2022
Est. Completion Date:
December 31, 2024
MGD: 2
Owner:
INAW
Engineer:
Gannett Fleming
If we seem a little unique for a construction company, we’ll take it as a compliment. We’d love to talk about what it be like to work together, the way we both want to.