City of Sioux Falls – Collector Well 25 Construction

Sioux Falls, South Dakota

  • Base of a large concrete water storage tank or tower at a Reynolds Construction project site

Project Description

Reynolds was contracted to install Collector Well 25 for the City of Sioux Falls, South Dakota. The collector well consists of a 16-foot ID by 19-foot OD caisson, approximately 70 feet in total length. This well is also equipped with four stainless-steel laterals, totaling 700 lineal feet. Reynolds self-performed all underground aspects of the project.

At A Glance

Contract Amount:
$3,399,502

Notice to Proceed:
June 1, 2023

Completion Date:
May 3, 2024

MGD: 7.2

Owner:
City of Sioux Falls

Engineer:
HDR Inc.