COBB COUNTY WATER SYSTEM GALLERIA AREA OUTFALL SEWER REPLACEMENT

Atlanta, GA

Project Description

This project is a sewer replacement for Cobb County. It includes 500lf of 84” tunnel with shafts, 600’ of open cut ductile pipe -30”, 1,400’ of 18 FPVC to be installed inside of a 7’x7’ box culvert, as well as a bypass system to carry all of the sewer during construction.

At A Glance

Contract Amount:
$9,303,048

Notice to Proceed:
February 16, 2023

Est. Completion Date:
February 13, 2025

Owner:
Cobb County

Engineer:
Cobb County

Get in Touch

If we seem a little unique for a construction company, we’ll take it as a compliment. We’d love to talk about what it be like to work together, the way we both want to.